A leadtime program can represent any delay between the time a product is ordered, and the time it is shipped. Programs may be assigned to products or options, and product catalogues may specify restrictions based on leadtimes.
Leadtime programs have the following attributes:
- Code – Every leadtime program must have a unique code to distinguish it from other leadtime programs.
- Description – A leadtime program may have a brief description. If the project the program belongs to has multiple languages enabled, a description may be set for every language enabled.
- Days – The length of the leadtime, in days.
- Vendor – If the project that the leadtime program belongs to has vendors enabled, the program will need to set a reference to one of the available vendors.
Comments
0 comments
Please sign in to leave a comment.